Plans

Architecture references and audit documents. Actionable implementation work lives in docs/projects/.

Reference Documents

PlanDescriptionStatus
V2 Fact EngineMaster v2 fact engine architecture and implementation referenceDraft
Fact Engine API GapsCross-cutting audit — spawned 4 projects belowDraft

Moved to Projects

The following plans were converted to project folders in docs/projects/:

Former PlanProject Folder
Marketing Site (design + plan)marketing-site
V1 Table Cleanup Phase 8 (design + plan)v1-table-cleanup
CSV Config Pipeline (design + plan)csv-config-pipeline
Railway Migrationrailway-migration
Evidence Enrichment (6 API plans)evidence-enrichment
API Gaps (Gaps 1+2+6)api-gaps
API Gaps → Challenge Conversations (Gap 4)challenge-conversations
API Gaps → Route Cleanup (Gap 5)route-cleanup

V1 Plans (Archived)

All v1 plans (MVP plan, cost optimization, Playwright integration, etc.) have been archived to docs/docs_archive/plans-v1/.

Plan Governance

Plans follow versioning rules defined in Plan Governance:

  • Never modify locked plans in place
  • Create new versions with parent references
  • Use status: draft, active, locked, or archived